Speedy summary
- Four helicopters are deployed for rescue operations in Uttarkashi, Uttarakhand, following flash floods and landslides earlier this week.
- 170 people were airlifted to ITBP’s Matli helipad and 107 to the Chinyalisaur airstrip on Saturday (Day 5 of rescue efforts).
- Over 1,000 individuals have been evacuated from the Dharali area sence Tuesday.
- Official reports confirm four deaths, with 49 people still missing.
- Power supply was severely disrupted in Dharali; a Chinook helicopter transported a generator set to a relief camp.
- A Bailey bridge is being constructed near Gangnani at Limchigad on an urgent basis to restore road connectivity. Construction continued overnight with plans for completion within 24 hours.
- The Gangotri highway remains blocked or damaged at several locations, delaying advanced search equipment’s arrival.
Indian Opinion Analysis
The ongoing evacuation and relief efforts in Uttarkashi highlight both the challenges of disaster management in mountainous terrain and the prompt response by authorities under urgent circumstances. With more then 1,000 people already rescued but dozens still unaccounted for, time remains critical given harsh conditions like blocked highways and power outages.
Constructing infrastructure such as Bailey bridges is vital not onyl for immediate recovery but also as a long-term disaster-preparedness measure in fragile Himalayan ecosystems prone to climate extremes. This incident underscores the importance of integrating robust infrastructure planning with disaster-resilient systems while addressing environmental concerns exacerbating such events.
Read more: https://www.thehindu.com/theme/images/th-online/1x1_spacer.png