– Phase 1 initially sanctioned 40 godowns.- Construction of 27 godowns is complete, work on four units is ongoing, and the remaining sites will begin construction soon.- Road connectivity issues persist for ten godowns, requiring attention.
– The district has supplied farmers with 30,500 metric tonnes of groundnut seeds for the Khariff season.
– Fertilizer stocks are available at Rythu Seva Kendras for farmers to use as needed based on crop patterns.
The progress initiatives outlined by Collector Sumit Kumar indicate a focused approach toward strengthening rural infrastructure in Chittoor district. Ensuring basic resources like electricity and water for MPFC warehouses can improve agricultural storage facilities considerably. Completion timelines drive accountability but resolving road connectivity challenges may require more extensive planning.
Additionally, the distribution of groundnut seeds and accessible fertilizer stock through Rythu Seva Kendras highlights proactive efforts to support farmers during a critical planting season-potentially boosting agricultural productivity locally.Introducing petrol pumps and medicine outlets via cooperative societies suggests diversification meant to enhance rural services while empowering cooperatives as economic drivers. This pilot projectS success could set a precedent for similar initiatives across other districts in India.
For further reading: Source Link